Busy times offshore

Hornsea Two Windfarm, Yorkshire, is due to be fully operational in 2022; Hornsea Two will span an offshore area of 462km². Its location is 89 km off the Yorkshire Coast in the North Sea, its proposed 165 Siemens Gamesa 8mw turbines will have the capacity of 1.4GW providing power to well over 1.3 million homes.

Field logging operations were conducted with the winch mounted under the rooster box. The Robertson Geo Marine Winch remained in this position throughout this phase of the project. Three Arm Caliper, High Resolution Acoustic Televiewer, PS Logger® and Formation Density probes were successfully deployed at multiple locations for sea bed investigation.

Archive :