Resources

BLOG

Not much room to work in

The new high speed railway (HS2) is due to run from central London through England, to Birmingham, Manchester and on to Glasgow and Edinburgh Scotland. As part of the ongoing work on the current phase […]

Read More

Safely working through these challenging times

Image shows a logging services application by the A38 highway at Derby UK on Tuesday May 5th as part of a project to eliminate roundabouts on the busy A38. We used Optical Televiewer, Acoustic Televiewer […]

Read More

Ground investigation at Stonehenge

As part of ground investigation for a 3km tunnel 18 boreholes were drilled; ranging from 146mm OD bores to 335mm OD wells with depths varying from 35m to 70m. The client was particularly interested in […]

Read More

Archive :